February 2009 - Road building !!!

Feb 2009, I was so happy, track re-surfacing had commenced 12hr days starting and finishing in the dark, loved it!

Track dug out, layer of white Teram, Layer of crushed concrete, then layer of lovely black road planings

Guy does all the digging and spreading of concrete and planings


White membrane called Teram stops the concrete being driven down into the soft mix of soil and chalk


At the bottom of the Byway it's looking like major roadworks are taking place...it's hard to believe it's just GUY and ME!!

Karina (me) on the digger

Safety first!!

It was 700m of Byway we had to dig out and remove soil from!

Guy about to dump his load!

All aboard!

I never did ride this roller, it felt way to uncontrollable downhill!