Feb 2009, I was so happy, track re-surfacing had commenced 12hr days starting and finishing in the dark, loved it! |
Track dug out, layer of white Teram, Layer of crushed concrete, then layer of lovely black road planings |
Guy does all the digging and spreading of concrete and planings |
White membrane called Teram stops the concrete being driven down into the soft mix of soil and chalk |
At the bottom of the Byway it's looking like major roadworks are taking place...it's hard to believe it's just GUY and ME!! |
![]() |
Karina (me) on the digger |
Safety first!! |
It was 700m of Byway we had to dig out and remove soil from! |
![]() |
Guy about to dump his load! |
All aboard! |
I never did ride this roller, it felt way to uncontrollable downhill! |